Suer And Pollon Mechanical
Menu
  • External link opens in new tab or window
  • External link opens in new tab or window
  • External link opens in new tab or window

SASKPOWER QUEEN ELIZABETH 200MW UPGRADE

Column

The installation of a supply and return  circulating water pipe consisting of 60" prestressed concrete embedded-cylinder pipe running from the pump house to the power plant.


Copyright 2019 Suer And Pollon


close lightbox