Suer And Pollon Mechanical
Menu
  • External link opens in new tab or window
  • External link opens in new tab or window
  • External link opens in new tab or window

CITY OF SASKATOON AVENUE H RESERVOIR

Column

CITY OF SASKATOON AVENUE H RESERVOIR


The construction of a new facility adjacent to the existing water treatment plant at Avenue H South and 11th Street that houses: 19 ML potable water reservoir

High lift pump station

3 48" Ultraviolet disinfection reactors

2 variable speed 140 ML/d (2000 hp) pumps

1 constant speed 90 ML/d (1200 hp)pump

2 constant speed 45 ML/d (600 hp) pumps.



Copyright 2019 Suer And Pollon


close lightbox